No. | Project Name | Customer | Main technical data | Qty. |
1 | Lijiayan Reservoir | Chengdu Lijiayan Development Co., Ltd. | Maintenance gate: 7×9-89m (FH=5607) | 1 set |
Maintenance gate: 12×19.9-19.45m (FH=4645 ) | 1 set | |||
Maintenance gate: 4×4-77m (FH=1232) | 1 set | |||
Maintenance gate: 6×15.1-14.77m (FH=1338) | 1set | |||
2 | TB Hydropower Station | Huaneng Lancang River Hydropower Inc. | Intake gate: 5.75×15.5-120m (FH=10695) | 4 sets |
Outlet gate: .5×10.44-9.94m (FH=1193) | 2 sets | |||
3 | Dongzhuang Hydro-junction Project | Shanxi Dongzhuang Hydro-junction Project Construction Co., Ltd. | Closure gate: 8×19-86 (FH=13072) | 2 sets |
4 | Lize Navigation Junction Project Phase I | Chongqing Jialing River Lize Avionics Development Co. Ltd. | Maintenance gate: 14.0×107.25-10.725m (FH=1610) | 2 sets |
Work gate: 14.0×10.725-10.725m (FH=1610) | 6 sets | |||
5 | Jinsha Hydropower Station | Sichuan Energy Panzhihua Hydropower Development Co. Ltd. | Maintenance gate: 14.5×23.43-23.43m (FH=7560m2) | 2 sets |
Closure gate: 14.5×14.81-14.81m (FH=3180) | 1 set | |||
Closure gate: 14.5×23.55-23.55m (FH=8041) | 1 set | |||
Work gate: 6×18.3-18.3m (FH=2009) | 1 set | |||
6 | Minjiang Qianwei Navigation Power Junction Project | Sichuan Minjiang Port Navigation and Electricity Development Co. Ltd. | Release sluice work sluice: 15´18.8-18m (FH=5076) | 10 sets |
7 | Huangshipan Reservoir | Guangdong Water Conservancy and Hydropower Third Engineering Bureau Co. Ltd. | Release sluice maintenance gate1: 4×22.5-22m (FH=6930) | 1set |
8 | Tuxikou Reservoir | Sichuan Tuxikou Reservoir Construction Administration Bureau | Closure gate: 6×14.5-81.22m (FH=7066) | 2 sets |
9 | Jinghe Junction Project Phase II | Xinjiang Yili River Basin Development and Construction Administration Bureau | Stop log work gate: 10×66-5m (FH=3300) | 1 set |
Emergency gate: 6.4×6.4-78.5m (FH=3215) | 1 set | |||
10 | Shimen Reservoir | Shanxi Hanzhong Shimen Reservoir Reinforcement Project Office | Inlet emergency gate: 6.8×7.2-58m (FH=2840) | 1 set |
Inlet emergency gate: 6.5×7-51m (FH=2320) | 1 set | |||
11 | Tangjiadu Hydropower Station | Sichuan Xinde Construction Co., Ltd. Hydraulic Equipment factory | Inlet maintenance gate: 5.2×17.511-25m (FH=2267) | 1 set |